Breaking News         Latest US News              New York News              Fx Tribune

How to Compare Car Insurance Policies?
If any more evidence was needed that the planned one-stop Scarborough subway extension makes no sense, new figures released on Tuesday show the estimated cost has crept up yet again to a staggering $3.35 billion.That’s up from $2 billion in early 2016,...

More evidence Scarborough subway extension makes no sense: Editorial | Toronto Star

If any more evidence was needed that the planned one-stop Scarborough subway extension makes no sense, new figures released on Tuesday show the estimated cost has crept up yet again to a staggering $3.35 billion.That’s up from $2 billion in early 2016,...

More evidence Scarborough subway extension makes no sense: Editorial  | Toronto Star

If any more evidence was needed that the planned one-stop Scarborough subway extension makes no sense, new figures released on Tuesday show the estimated cost has crept up yet again to a staggering $3.35 billion.

That’s up from $2 billion in early 2016, a number that was revised repeatedly over the course of the year to $2.9 billion, then $3.16 billion, and then $3.2 billion. Now a report from city staff puts the total bill at $3.35 billion, due mostly to improving a planned new bus station.

You get the picture. It’s a runaway train and there’s no telling where it’s going to stop.

In fact, as the Star’s Jennifer Pagliaro and Ben Spurr report, city staff acknowledge that the range of accuracy for the latest estimate could be off by fully 50 per cent, meaning it could come in as high as $5.02 billion. All that to add a single new stop to the Bloor-Danforth line.

Worse, the cost continues to go up even as the estimated number of new riders the extension will attract is going down. The new study puts it at only 2,300, about half the 4,500 new riders estimated just last summer.

Yet Mayor John Tory continues to argue vehemently in favour of this project, saying that those who are against the extension are “playing politics.”

Indeed, someone is playing politics. But it isn’t the opponents of the Scarborough extension.

Nor does there appear to be any light at the end of this particular tunnel. Asked whether there was any cost that would be too much to spend on the one-stop extension, Tory replied, “I’m just not going to get into that.”

He should. In fact, the mayor owes it to taxpayers and transit riders across the city to explain just what it would take for him to pull the plug on this venture.

The new report shows the subway extension is expected to attract only 2,300 new daily riders compared to the existing Scarborough RT line, which needs to be replaced. That means the city would be paying approximately $1.45 million for every new rider the subway attracts.

And then there’s this: the increase in the estimated cost of the one-stop extension threatens funding for the proposed light rail line along Eglinton Ave. East. That 18-stop LRT is estimated to cost $1.6 billion, money that was supposed to be part of a $3.56-billion funding envelope for both projects.

So much for that.

The subway has been controversial ever since former mayor Rob Ford cancelled plans for a sensible seven-stop light rail line that would have been fully funded by the province in favour of the costly subway extension.

Tory then made it a campaign promise as he bid for suburban votes in 2014. He has since refused to back down on it, despite a growing mass of evidence that it’s a bad idea. Indeed, he insists that it’s “the right thing to do.”

It’s not. The right thing is to serve the residents of Scarborough and the rest of Toronto with the best available rapid transit, while being mindful of overall costs.

Everyone’s interests would be better met by a network of less expensive LRT lines that would reach low-income neighbourhoods as well as the Centennial College and University of Toronto Scarborough campuses.

At the same time, the money now earmarked for the one-stop Scarborough extension would better serve as a down-payment on other transit projects that Toronto truly needs — in particular, on a subway “relief line” designed to ease pressure on the massively over-crowded Yonge line.

When the updated plan comes before city council the mayor and councillors should “do the right thing” and stop this project in its tracks before more time and money are wasted. Enough, already.

The Toronto Star and thestar.com, each property of Toronto Star Newspapers Limited, One Yonge Street, 4th Floor, Toronto, ON, M5E 1E6. You can unsubscribe at any time. Please contact us or see our privacy policy for more information.

Our editors found this article on this site using Google and regenerated it for our readers.

Publish Date : 28 Şubat 2017 Salı 17:58

Breaking News Headlines

Tipping in America- What Should You Know as a Traveler?
Tipping in America- What Should You Know as a Traveler?
Sepi proposes to the ex-minister Miguel Sebastian as a director of Indra
Sepi proposes to the ex-minister Miguel Sebastian as a director of Indra
There are two Spains in the employment
There are two Spains in the employment
Valerio dodge the shock with the CEOE and downgrade to 7% the rise of the bases maximum contribution
Valerio dodge the shock with the CEOE and downgrade to 7% the rise of the bases maximum contribution
Spain puts an end in the EU in four years of cuts in the quota of hake south
Spain puts an end in the EU in four years of cuts in the quota of hake south
The US Federal Reserve raises interest rates to 2.5%, but cooled expectations for 2019
The US Federal Reserve raises interest rates to 2.5%, but cooled expectations for 2019
Carlos Torres throws a 'dance' of managers in BBVA to promote the transformation of the bank
Carlos Torres throws a 'dance' of managers in BBVA to promote the transformation of the bank
One out of every three temporary contracts signed in the Basque country does not last one week
One out of every three temporary contracts signed in the Basque country does not last one week
Balearic islands, get the worst education in Europe
Balearic islands, get the worst education in Europe
The nine highways rescued will be free for the night and will fall by up to 30% during the rest of the day
The nine highways rescued will be free for the night and will fall by up to 30% during the rest of the day
Mango asks for a syndicated loan of 500 million to refinance its debt until 2023
Mango asks for a syndicated loan of 500 million to refinance its debt until 2023
Calviño: "it is Not desirable, from any point of view, the extension of the Budgets"
Calviño:
POLLS Results ALL
Who is the most powerful actor in Syria

Front Pages
  • The Sun
NEWS ARCHIVES